Say your window schedule lists 40 sliding windows. The openings are measured, the frame color is agreed, and you plan to buy the glass locally. What should you ask the aluminum supplier to put in the container?
Start with your workshop. Can your team cut the frames and machine the lock slots? Can they assemble a square sash from labeled parts? Or do you want the frames and sashes assembled before they leave the factory? Each answer leads to a different quotation for those same 40 windows.
| What you order | What to confirm on the quote | Work to plan for after delivery |
|---|---|---|
| Finished windows and doors | Frame and sash assembly, glazing, hardware and packing arrangement | Fit any items removed for shipping, install the units and adjust the hardware |
| Fabricated kits | Cut lengths, machined holes and slots, part labels, hardware and assembly drawings | Assemble the numbered parts, glaze the sashes and check their operation |
| Full-length aluminum profiles | Section numbers, bar lengths, finish and matching accessories | Prepare cutting lists, cut and machine the bars, then assemble and glaze each unit |
Take the largest door on your schedule and trace its route from the truck to the opening. Can the packed frame get through the service entrance? Will the crew have room to turn it in the corridor? A door that fits the wall opening can still be awkward to move through the building.
Ask the supplier to show the packed dimensions and confirm whether the frame, sliding panels and glass travel together or separately. That gives the site supervisor something concrete to plan around. It also settles what “finished” means on this particular order.
Pick one window mark, say W-07, and ask for its packing list before approving the batch. Can the assembler identify the head, sill, jambs and sash pieces from the labels? Does the drawing show which way the window slides when viewed from outside? Are the lock slots and drainage holes already machined?
Then look for the small parts. If the W-07 list includes rollers and a lock but leaves out the keeper, the workshop has an almost finished window and one more part to source. A parts list for one complete unit is a good way to catch that omission before it repeats across the order.
Full-length bars give a fabricator room to change the cutting list as orders come in. Before choosing that route for an unfamiliar series, put a short section on the bench. Fit the roller you intend to stock, check the lock against its keeper, and try the gasket and glazing bead with a sample of the specified glass.
Ask whoever runs the machines to check the section drawing too. A roller can fit the bottom rail perfectly while the workshop still needs a different punch to make the drainage slot.
Suppose the purchase order says only glass supplied locally. The glass shop still needs a cutting size, and the assembler needs a bead and gasket that suit the overall glass thickness. A short note against each window mark can settle all three questions:
W-07 — Glass supplied by buyer. Overall glass thickness: ___ mm. Glass cutting sizes issued by: ___. Glazing beads supplied by: ___. Gaskets supplied by: ___. Release the glass order after approval of the window drawing.
Leave those blanks open until both parties agree. It is much easier to change a bead selection on a drawing than to find out it will not seat after the glass has arrived.
For a quotation, send your window and door schedule to manager@xingdal.com. Mark one typical opening and tell us which operations your team wants to handle locally. We can use that opening to agree on the supply scope before pricing the rest.